Purchase Protection

Powerful Protection from Payment to Delivery

Secure and Reliable Payment

Money Back Guarantee

Shipping and Delivery

After-Sales Service

IRS2168DSTRPBF
All product names, trademarks, brands, and logos on this site are the property of their respective owners. Their use is for identification purposes only and does not imply any affiliation or authorization from the rights holders. We are not authorized dealers or distributors of the brand. The warranty is provided by us, not the original manufacturer.
Product Details
Manufacturer
Infineon
Product Category
Lighting, Ballast Controllers
Series
-
Product
Half-Bridge Drivers
Type
PFC/Ballast Controller
Packaging
Alternate Packaging
Unit-Weight
0.023492 oz
Mounting-Style
SMD/SMT
Package-Case
SOIC-16
Frequency
42.5kHz ~ 46.5kHz
Operating-Temperature
-25°C ~ 125°C
Mounting-Type
Surface Mount
Voltage-Supply
11.5 V ~ 16.6 V
Current-Supply
10mA
current sources and sinks
-
Dimming
No
Pd-Power-Dissipation
1.4 W
Maximum Operating Temperature
+ 125 C
Operating temperature range
- 25 C
Operating-Supply-Current
7.2 mA
Output-Current
260 mA
Fall-Time
50 ns
Rise-Time
120 ns
Supply-Voltage-Max
15.6 V
Supply-Voltage-Min
12.5 V
Number-of-Drivers
1 Driver
IRS2168DSTRPBF - Brand New Infineon Lighting, Ballast Controllers
Brand:Infineon
Manufacturer Part No.:IRS2168DSTRPBF
Request Quote:
Quantity
Shipping Costs:
Free ShippingEstimated 15-30 business days via Registered Air Mail or othersSee details
Delivery:
Estimated between Wed, Apr 9 and Fri, Apr 11.This item requires 2-5 business days for processing before shipping after payment is confirmed. And depending on the destination and shipping method.See details
Return:60 days returns. Buyer pays for return shipping.See details
Payments:
Shop with confidence

One-month free return and one year warranty.

Full or Partial Refund , If the item is not as described

Full Refund if you don't receive your order

The tension in logistics has eased and normal shipping has resumed. All orders shipments will be sent out within 1-2 days.