
⚠ All product names, trademarks, brands, and logos on this site are the property of their respective owners. Their use is for identification purposes only and does not imply any affiliation or authorization from the rights holders. We are not authorized dealers or distributors of the brand. The warranty is provided by us, not the original manufacturer.
DPA424R-TL
DPA424R-TL - Brand New Power Integrations Special Purpose Voltage Regulators
- One-month free return and one year warranty.
- Full or Partial Refund, if the item is not as described
- Full Refund if you don't receive your order
Description
The DPA-Switch IC family is a highly integrated solution for DC-DC conversion
applications with 16-75 VDC input.
DPA-Switch uses the same proven topology as TOPSwitch®, cost effectively
integrating a power MOSFET, PWM control, fault protection and other control
circuitry onto a single CMOS chip. High performance features are enabled with
three user configurable pins. Hysteretic thermal shutdown is also provided. In
addition, all critical parameters (i.e. current limit, frequency, PWM gain)
have tight temperature and absolute tolerance, to simplify design and reduce
system cost.
Product Highlights
Highly Integrated Solution
• Eliminates up to 50 external components–saves space, cost
• Integrates 220 V high frequency MOSFET, PWM control
• Lower cost plastic DIP surface mount (G package) and through-hole (P
package) options for designs ≤35 W
• Thermally efficient TO-263-7C (R package) option for high power applications
Superior Performance and Flexibility
• Eliminates all external current sensing circuitry
• Built-in auto-restart for output overload/open loop protection
• Pin selectable 300/400 kHz fixed frequency
• Wide input (line) voltage range: 16-75 VDC
• Externally programmable current limit
• Source connected tab reduces EMI
• Line undervoltage (UV) detection: meets ETSI standards
• Line overvoltage (OV) shutdown protection
• UV/OV limits gate drive voltage for synchronous rectification
• Fully integrated soft-start for minimum stress/overshoot
• Supports forward or flyback topology
• Cycle skipping: regulation to zero load without pre-load
• Hysteretic thermal shutdown for automatic fault recovery
• RoHS compliant P and G package options
EcoSmart™– Energy Efficient
• Extremely low consumption at no-load
• Cycle skipping at light load for high standby efficiency
Applications
• PoE applications, VoIP phones, WLAN, security cameras
• Telco central office equipment: xDSL, ISDN, PABX
• Distributed power architectures (24 V/48 V bus)
• Industrial controls
Shipping
| First item | Additional item | Service | Description |
|---|---|---|---|
| $0.00 | Free | Free Shipping | Estimated 15-30 business days via Registered Air Mail or others |
| $27.50 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
| $0.00 | Free | Buyer cooperating carrier | Using buyer's cooperating carrier. Buyer should create a shipping label and share it to us. And then we will call carrier for pickup |
| $38.00 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
Delivery
- The transportation time may be delayed due to customs clearance, local holidays or abnormal events.
- The estimated time is based on the fastest speed provided by commercial couriers (DHL, FedEx, UPS etc).
- The estimated time does not include the lead time of the item. The lead time of most items is 2–5 business days. If more than 5 working days are needed, we will manually confirm with you.
| Flag | Country | Express Delivery | Standard Delivery |
|---|---|---|---|
| United States | 3 - 5 days | 10-15 days | |
| Canada | 3 - 5 days | 10-20 days | |
| Mexico | 3 - 5 days | 10-17 days | |
| Germany | 3 - 5 days | 10-12 days | |
| Italy | 3 - 5 days | 10-15 days | |
| United Kingdom | 3 - 5 days | 10-12 days |
Estimated Delivery
This item requires 2-5 business days for processing before shipping after payment is confirmed. And depending on the destination and shipping method.
Return Policy
| Return window | Refund type | Return shipping |
|---|---|---|
| 60 days after receiving item | Money Back or Replacement | Buyer pays for return shipping |