
⚠ All product names, trademarks, brands, and logos on this site are the property of their respective owners. Their use is for identification purposes only and does not imply any affiliation or authorization from the rights holders. We are not authorized dealers or distributors of the brand. The warranty is provided by us, not the original manufacturer.
ADE7878ACPZ-RL
ADE7878ACPZ-RL - Brand New Analog Devices Energy Metering
- One-month free return and one year warranty.
- Full or Partial Refund, if the item is not as described
- Full Refund if you don't receive your order
GENERAL DESCRIPTION
The ADE7854/ADE7858/ADE7868/ADE7878 are high accuracy, 3-phase electrical energy measurement ICs with serial interfaces and three flexible pulse outputs. The ADE78xx devices incorporate second-order sigma-delta (Σ-∆) analog-to-digital converters (ADCs), a digital integrator, reference circuitry, and all of the signal processing required to perform total (fundamental and harmonic) active, reactive (ADE7878, ADE7868, and ADE7858), and apparent energy measurement and rms calculations, as well as fundamental- only active and reactive energy measurement (ADE7878) and rms calculations. A fixed function digital signal processor (DSP) executes this signal processing. The DSP program is stored in the internal ROM memory.
FEATURES
Highly accurate; supports EN 50470-1, EN 50470-3, IEC 62053-21, IEC 62053-22,
and IEC 62053-23 standards
Compatible with 3-phase, 3- or 4-wire (delta or wye), and other 3-phase
services
Supplies total (fundamental and harmonic) active, reactive (ADE7878, ADE7868,
and ADE7858 only), and apparent energy, and fundamental active/reactive energy
(ADE7878 only) on each phase and on the overall system
Less than 0.1% error in active and reactive energy over a dynamic range of
1000 to 1 at TA = 25°C
Less than 0.2% error in active and reactive energy over a dynamic range of
3000 to 1 at TA = 25°C
Supports current transformer and di/dt current sensors
Dedicated ADC channel for neutral current input (ADE7868 and ADE7878 only)
Less than 0.1% error in voltage and current rms over a dynamic range of 1000
to 1 at TA = 25°C
Supplies sampled waveform data on all three phases and on neutral current
Selectable no load threshold levels for total and fundamental active and
reactive powers, as well as for apparent powers
Low power battery mode monitors phase currents for antitampering detection
(ADE7868 and ADE7878 only)
Battery supply input for missing neutral operation Phase angle measurements in
both current and voltage channels with a typical 0.3° error
Wide-supply voltage operation: 2.4 V to 3.7 V
Reference: 1.2 V (drift +5 ppm/°C typical) with external overdrive capability
Single 3.3 V supply
40-lead lead frame chip scale package (LFCSP), Pb-free
Operating temperature: −40°C to +85°C
Flexible I2C, SPI, and HSDC serial interfaces
APPLICATIONS
Energy metering systems
Shipping
| First item | Additional item | Service | Description |
|---|---|---|---|
| $0.00 | Free | Free Shipping | Estimated 15-30 business days via Registered Air Mail or others |
| $27.50 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
| $0.00 | Free | Buyer cooperating carrier | Using buyer's cooperating carrier. Buyer should create a shipping label and share it to us. And then we will call carrier for pickup |
| $38.00 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
Delivery
- The transportation time may be delayed due to customs clearance, local holidays or abnormal events.
- The estimated time is based on the fastest speed provided by commercial couriers (DHL, FedEx, UPS etc).
- The estimated time does not include the lead time of the item. The lead time of most items is 2–5 business days. If more than 5 working days are needed, we will manually confirm with you.
| Flag | Country | Express Delivery | Standard Delivery |
|---|---|---|---|
| United States | 3 - 5 days | 10-15 days | |
| Canada | 3 - 5 days | 10-20 days | |
| Mexico | 3 - 5 days | 10-17 days | |
| Germany | 3 - 5 days | 10-12 days | |
| Italy | 3 - 5 days | 10-15 days | |
| United Kingdom | 3 - 5 days | 10-12 days |
Estimated Delivery
This item requires 2-5 business days for processing before shipping after payment is confirmed. And depending on the destination and shipping method.
Return Policy
| Return window | Refund type | Return shipping |
|---|---|---|
| 60 days after receiving item | Money Back or Replacement | Buyer pays for return shipping |