Chipdatas
ADE7878ACP
ADE7878ACP ADE7878ACP - Brand New Analog Devices Energy Metering
Get Quote
Buy Now

ADE7878ACP

ADE7878ACP - Brand New Analog Devices Energy Metering

Manufacturer Part No: ADE7878ACP In Stock
MOQ: 1pcs
Category: Energy Metering
Condition
Quantity
Shipping:
Free ShippingEstimated 15-30 business days via Registered Air Mail or othersSee details
Delivery:
Estimated between Mon, May 4 and Wed, May 6.This item requires 2-5 business days for processing before shipping after payment is confirmed. And depending on the destination and shipping method.See details
Return:
60 days returns. Buyer pays for return shippingSee details
Payments:
PayPalVisaMastercardAmexBank Transfer Credit Card
Shop with confidence
  • One-month free return and one year warranty.
  • Full or Partial Refund, if the item is not as described
  • Full Refund if you don't receive your order
Contact us
ManufacturerAnalog Devices
Product CategoryEnergy Metering

GENERAL DESCRIPTION

The ADE7854/ADE7858/ADE7868/ADE7878 are high accuracy, 3-phase electrical energy measurement ICs with serial interfaces and three flexible pulse outputs. The ADE78xx devices incorporate second-order sigma-delta (Σ-∆) analog-to-digital converters (ADCs), a digital integrator, reference circuitry, and all of the signal processing required to perform total (fundamental and harmonic) active, reactive (ADE7878, ADE7868, and ADE7858), and apparent energy measurement and rms calculations, as well as fundamental- only active and reactive energy measurement (ADE7878) and rms calculations. A fixed function digital signal processor (DSP) executes this signal processing. The DSP program is stored in the internal ROM memory.

FEATURES

Highly accurate; supports EN 50470-1, EN 50470-3, IEC 62053-21, IEC 62053-22, and IEC 62053-23 standards
Compatible with 3-phase, 3- or 4-wire (delta or wye), and other 3-phase services
Supplies total (fundamental and harmonic) active, reactive (ADE7878, ADE7868, and ADE7858 only), and apparent energy, and fundamental active/reactive energy (ADE7878 only) on each phase and on the overall system
Less than 0.1% error in active and reactive energy over a dynamic range of 1000 to 1 at TA = 25°C
Less than 0.2% error in active and reactive energy over a dynamic range of 3000 to 1 at TA = 25°C
Supports current transformer and di/dt current sensors
Dedicated ADC channel for neutral current input (ADE7868 and ADE7878 only)
Less than 0.1% error in voltage and current rms over a dynamic range of 1000 to 1 at TA = 25°C
Supplies sampled waveform data on all three phases and on neutral current
Selectable no load threshold levels for total and fundamental active and reactive powers, as well as for apparent powers
Low power battery mode monitors phase currents for antitampering detection (ADE7868 and ADE7878 only)
Battery supply input for missing neutral operation Phase angle measurements in both current and voltage channels with a typical 0.3° error
Wide-supply voltage operation: 2.4 V to 3.7 V
Reference: 1.2 V (drift +5 ppm/°C typical) with external overdrive capability
Single 3.3 V supply
40-lead lead frame chip scale package (LFCSP), Pb-free
Operating temperature: −40°C to +85°C
Flexible I2C, SPI, and HSDC serial interfaces

APPLICATIONS

Energy metering systems

Shipping

Item location:China
Ships to:Worldwide
First item Additional item Service Description
$0.00 Free Free Shipping Estimated 15-30 business days via Registered Air Mail or others
$27.50 Free Expedited Shipping Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx.
$0.00 Free Buyer cooperating carrier Using buyer's cooperating carrier. Buyer should create a shipping label and share it to us. And then we will call carrier for pickup
$38.00 Free Expedited Shipping Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx.
Please contact us if need

Delivery

  • The transportation time may be delayed due to customs clearance, local holidays or abnormal events.
  • The estimated time is based on the fastest speed provided by commercial couriers (DHL, FedEx, UPS etc).
  • The estimated time does not include the lead time of the item. The lead time of most items is 2–5 business days. If more than 5 working days are needed, we will manually confirm with you.
FlagCountryExpress DeliveryStandard Delivery
United StatesUnited States3 - 5 days10-15 days
CanadaCanada3 - 5 days10-20 days
MexicoMexico3 - 5 days10-17 days
GermanyGermany3 - 5 days10-12 days
ItalyItaly3 - 5 days10-15 days
United KingdomUnited Kingdom3 - 5 days10-12 days

Estimated Delivery

Estimated between Mon, May 4 and Wed, May 6.

This item requires 2-5 business days for processing before shipping after payment is confirmed. And depending on the destination and shipping method.

Return Policy

Return window Refund type Return shipping
60 days after receiving item Money Back or Replacement Buyer pays for return shipping
Recensioni verificate

Recensioni reali di acquirenti su componenti elettronici.

99.8% positivoFeedback da eBay
Cart RFQ Wishlist Email Telegram WhatsApp Youtube Chat
Cart (0 Items)
empty

Your cart is empty

RFQ List (0 Items)
empty

No inquiry items yet