
⚠ All product names, trademarks, brands, and logos on this site are the property of their respective owners. Their use is for identification purposes only and does not imply any affiliation or authorization from the rights holders. We are not authorized dealers or distributors of the brand. The warranty is provided by us, not the original manufacturer.
LQSD103B
LQSD103B - Brand New PANJIT IC Chips
- One-month free return and one year warranty.
- Full or Partial Refund, if the item is not as described
- Full Refund if you don't receive your order
General Description
The AS8218 / AS8228 are highly integrated CMOS single-phase energy metering devices for fully electronic LCD meter systems. The AS8218 / AS8228 have been designed to ensure the meters full compliance with the international Standards IEC62052 and ANSI.
Key Features
- Precision single-phase, one or two current input energy measurement front-
end including SigmaDelta modulators for A/D-conversion and digital signal
processor (DSP).
- Low current consumption of 5mA, depending on MCU activity.
- Digital phase correction and selectable gain on both current channels for
use with two current transformers (CT) or one CT and one shunt.
- Power-supply monitor (PSM) for power-on reset and reset when the supply
voltage falls below a defined threshold.
- Customer programmable 8-bit 8051 compatible microcontroller (MCU).
- Programmable MCU clock with optional low power operating conditions.
- 2 x Universal Asynchronous Receiver / Transmitters (UART) for external
communications such as programme download and debugging.
- Programmable watchdog timer (WDT) and external system reset pin.
- Real-time clock/calendar (RTC) with on-chip digital calibration and
separate battery supply pin.
- On-chip voltage reference (VREF) with small temperature coefficient.
- Low power 3.0 – 4.0MHz crystal oscillator.
- SPI compatible interface for external EEPROM memory.
- Standard on-chip LCD driver (LCDD) interface.
- Programmable multi-purpose I/Os (MPIO) with selectable data direction,
pull-up or pull-down resistors and drive strength.
- Mains current lead/lag status indication for reactive energy measurement.
- Low power battery operating mode for meter reading when Mains voltage is
not present.
- The AS8218 and AS8228 ICs offer the following options:
AS8218: 20 x 4 segment LCDD 9 x multi-purpose I/O (MPIO)
AS8228: 24 x 4 segment LCDD 12 x multi-purpose I/O (MPIO)
Shipping
| First item | Additional item | Service | Description |
|---|---|---|---|
| $0.00 | Free | Free Shipping | Estimated 15-30 business days via Registered Air Mail or others |
| $27.50 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
| $0.00 | Free | Buyer cooperating carrier | Using buyer's cooperating carrier. Buyer should create a shipping label and share it to us. And then we will call carrier for pickup |
| $38.00 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
Delivery
- The transportation time may be delayed due to customs clearance, local holidays or abnormal events.
- The estimated time is based on the fastest speed provided by commercial couriers (DHL, FedEx, UPS etc).
- The estimated time does not include the lead time of the item. The lead time of most items is 2–5 business days. If more than 5 working days are needed, we will manually confirm with you.
| Flag | Country | Express Delivery | Standard Delivery |
|---|---|---|---|
| United States | 3 - 5 days | 10-15 days | |
| Canada | 3 - 5 days | 10-20 days | |
| Mexico | 3 - 5 days | 10-17 days | |
| Germany | 3 - 5 days | 10-12 days | |
| Italy | 3 - 5 days | 10-15 days | |
| United Kingdom | 3 - 5 days | 10-12 days |
Estimated Delivery
This item requires 2-5 business days for processing before shipping after payment is confirmed. And depending on the destination and shipping method.
Return Policy
| Return window | Refund type | Return shipping |
|---|---|---|
| 60 days after receiving item | Money Back or Replacement | Buyer pays for return shipping |