
⚠ All product names, trademarks, brands, and logos on this site are the property of their respective owners. Their use is for identification purposes only and does not imply any affiliation or authorization from the rights holders. We are not authorized dealers or distributors of the brand. The warranty is provided by us, not the original manufacturer.
ZABG4001
ZABG4001 - Brand New ZETEX Power Management Specialized - PMIC
- One-month free return and one year warranty.
- Full or Partial Refund, if the item is not as described
- Full Refund if you don't receive your order
Summary
The ZABG4002 is a four stage depletion mode FET bias controller intended primarily for satellite Low Noise Block’s (LNB’s), but its also suitable for other LNA applications such as those in found in PMR’s and microwave links. The ZABG4002 provides each FET with an independent protected negative gate voltage and positive drain voltage with user programmable drain current. Combining an advanced IC process and packaging techniques, the ZABG4002 helps minimise power consumption, component cost and PCB area whilst enhancing overall reliability.
Features
• Four stage FET bias controller
• Operating range of 3.0V to 8.0V
• Low quiescent supply current, 1.2mA typical
• FET drain voltages set at 2.0V
• FET drain current selectable from 0 to 15mA
• Switchable FETs for power management
• Allows first and second stage FETs to be run at different (optimum) drain
currents
• FET drain voltages and currents held stable over temperature and Vcc
variations
• FETs protected against overstress during power-up and power-down.
• Internal negative supply generator allowing single supply operation
(available for external use)
• Low external component count
Applications
• Twin LNB’s
• Quad LNB’s
• US LNB’s
• Microwave links
• PMR and Cellular telephone systems
Shipping
| First item | Additional item | Service | Description |
|---|---|---|---|
| $0.00 | Free | Free Shipping | Estimated 15-30 business days via Registered Air Mail or others |
| $27.50 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
| $0.00 | Free | Buyer cooperating carrier | Using buyer's cooperating carrier. Buyer should create a shipping label and share it to us. And then we will call carrier for pickup |
| $38.00 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
Delivery
- The transportation time may be delayed due to customs clearance, local holidays or abnormal events.
- The estimated time is based on the fastest speed provided by commercial couriers (DHL, FedEx, UPS etc).
- The estimated time does not include the lead time of the item. The lead time of most items is 2–5 business days. If more than 5 working days are needed, we will manually confirm with you.
| Flag | Country | Express Delivery | Standard Delivery |
|---|---|---|---|
| United States | 3 - 5 days | 10-15 days | |
| Canada | 3 - 5 days | 10-20 days | |
| Mexico | 3 - 5 days | 10-17 days | |
| Germany | 3 - 5 days | 10-12 days | |
| Italy | 3 - 5 days | 10-15 days | |
| United Kingdom | 3 - 5 days | 10-12 days |
Estimated Delivery
This item requires 2-5 business days for processing before shipping after payment is confirmed. And depending on the destination and shipping method.
Return Policy
| Return window | Refund type | Return shipping |
|---|---|---|
| 60 days after receiving item | Money Back or Replacement | Buyer pays for return shipping |