
⚠ All product names, trademarks, brands, and logos on this site are the property of their respective owners. Their use is for identification purposes only and does not imply any affiliation or authorization from the rights holders. We are not authorized dealers or distributors of the brand. The warranty is provided by us, not the original manufacturer.
R2A20035SP
R2A20035SP - Brand New RENESAS IC Chips
- One-month free return and one year warranty.
- Full or Partial Refund, if the item is not as described
- Full Refund if you don't receive your order
Description
R2A20104/114 series is a boost converter control IC with PFC (Power Factor Correction). Employing continuous conduction mode interleaving PFC, it performs higher efficiency and lower switching noise even for high power use. The control of continuous conduction mode is carried out by detecting the current in power MOSFET. The R2A20114 series supports two types of current detection methods; current detection by current transformers (R2A20104SP/FP), and that by shunt resisters (R2A20114SP/FP). So that, it can be applicable for a variety of applications. Interleaving control of the boost converters, namely, producing 180 degrees phase shift between the output signals (GD1,2) driving the boost converters, enables the system to perform high conversion efficiency and low switching noises and, at the same time, to reduces ripple currents in input and output current and then this allows use of smaller components such as boost inductors, input filters and output capacitors. R2A20114 series integrates a various kinds of protection circuits, such as the detection circuit of breaking of wire in feedback loop, two modes of over voltage protection circuits, over current protection circuit and error output circuit (*1), which improve the reliability of the power supply system and reduce the number of component parts on the system.
Features
• Maximum Ratings
⎯ Supply voltage Vcc: 24 V
⎯ Junction temperature Tj: from –40 to +150 degrees centigrade
• Electrical characteristics
⎯ VFB feedback voltage VREF: 2.5 V ± 1.5%
⎯ UVLO (Undervoltage Lockout) operation start voltage VH: 10.4 V ± 0.7 V
⎯ UVLO operation shutdown voltage VL: 8.9 V ± 0.5 V
⎯ UVLO hysteresis voltage Hysuvl : 1.5 V ± 0.5 V
• Functions
⎯ Boost converter control with continuous conduction mode
⎯ Interleaving control
⎯ Frequency modulation (2)
⎯ Brownout
⎯ Phase drop (1)
⎯ External clock synchronization input
⎯ External clock synchronization output (1)
⎯ Two modes of over voltage protections
Mode 1: Dynamic OVP preventing over voltage after sudden variation of load.
Mode 2: Static OVP preventing over voltage in the period of normal operation.
⎯ Feedback loop wire breaking/open detector
⎯ Dual over voltage protection circuits (1): FB and OVP2 terminals
⎯ Current balance control
⎯ Phase 1 and Phase 2 independent over current protection
⎯ Package line-up
Pb-free LQFP-40 (R2A20104FP, R2A20114FP)
Pb-free SOP-20 (R2A20104SP, R2A20114SP)
Shipping
| First item | Additional item | Service | Description |
|---|---|---|---|
| $0.00 | Free | Free Shipping | Estimated 15-30 business days via Registered Air Mail or others |
| $27.50 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
| $0.00 | Free | Buyer cooperating carrier | Using buyer's cooperating carrier. Buyer should create a shipping label and share it to us. And then we will call carrier for pickup |
| $38.00 | Free | Expedited Shipping | Estimated delivery time is 3-5 business days, with some areas possibly taking 6-9 business days depending on the shipping address. The main courier companies include but are not limited to UPS, DHL, and FedEx. |
Delivery
- The transportation time may be delayed due to customs clearance, local holidays or abnormal events.
- The estimated time is based on the fastest speed provided by commercial couriers (DHL, FedEx, UPS etc).
- The estimated time does not include the lead time of the item. The lead time of most items is 2–5 business days. If more than 5 working days are needed, we will manually confirm with you.
| Flag | Country | Express Delivery | Standard Delivery |
|---|---|---|---|
| United States | 3 - 5 days | 10-15 days | |
| Canada | 3 - 5 days | 10-20 days | |
| Mexico | 3 - 5 days | 10-17 days | |
| Germany | 3 - 5 days | 10-12 days | |
| Italy | 3 - 5 days | 10-15 days | |
| United Kingdom | 3 - 5 days | 10-12 days |
Estimated Delivery
This item requires 2-5 business days for processing before shipping after payment is confirmed. And depending on the destination and shipping method.
Return Policy
| Return window | Refund type | Return shipping |
|---|---|---|
| 60 days after receiving item | Money Back or Replacement | Buyer pays for return shipping |